1The USTA vision

Track your best people. Finish projects faster with USTA AI

Your workers are the heart of every project. USTA Robotics helps each of them pick up the know-how of your top master craftsman, work safer and grow their skills, so your whole site builds faster, safer and to one standard.

Today: better crews through data and trainingNext: the UAE's first construction AIThen: construction robotics
2The why

Great crews. Held back by an outdated system.

Your people are the strength of every site. What holds them back is the system around them: hiring is slow, skills are passed on by word of mouth, and owners can't see what really happens on site. These are the nine problems contractors face today.

01Hiring UAE
55%

"I can't find enough skilled workers, and Saudi keeps poaching the good ones."

55% of UAE construction firms saw labour rates go up in just six months, with fierce competition for talent from Saudi Arabia. Specialist skills are the bottleneck in every Gulf market.

Gleeds Middle East Construction Market Report, 2024
02New hires
44%

"Every new worker is a big investment, and the first year is the riskiest."

Visa, medical, Emirates ID, flights and mandatory health insurance come before day one. Then 44% of construction injuries happen in a worker's first year, and each injury costs 114 workdays on average.

Travelers Injury Impact Report, 2026
03Training and know-how
5+languages

"Every foreman teaches his own way, and the best know-how is never written down."

One UAE site can run in Hindi, Urdu, Bengali, Malayalam, Nepali, Tagalog and Arabic, so there is no single standard method. Supervisors with 20+ years rely most on know-how they never write down, and it leaves when they do.

ASCE Journal of Construction Engineering and Management, 2021
04Heat UAE
AED 50k

"Summer is a nightmare: the heat, the midday break, the inspectors."

No outdoor work 12:30 to 3pm from 15 June to 15 September, fines of AED 5,000 per worker up to AED 50,000, and around 134,000 MOHRE inspections in one season. Inland sites pass 50°C.

MOHRE via The National, 2025 · Gulf News, 2024
05Accidents UAE
AED 200k

"One serious accident and the whole site stops."

A death on site means up to 24 months' wage in compensation (capped at AED 200,000), wages and medical costs during treatment, plus civil and criminal liability that insurance does not cover. Falls cause 39% of construction deaths.

UAE Government portal · US BLS, 2023
06Insurance
8–36×

"My insurer prices me on my loss record, and I have no data to argue back."

Even with Middle East rates easing, contractors with a poor loss record still face capped cover and higher rates. And the uninsured costs of an accident (downtime, replacements, delays) can run 8 to 36 times what the insurance pays.

Marsh via Middle East Insurance Review, 2025 · HSE UK
07Visibility
35%

"I can't be on every site, so all I see is a short update on WhatsApp."

35% of construction time goes to non-productive work: waiting, searching, fixing mistakes. Owners only see a daily progress report and photos, so the lost hours stay invisible.

FMI and PlanGrid (Autodesk), Construction Disconnected
08Rework
5%to 20%

"We pay to build it twice."

Field rework eats around 5% of total project cost on average, and up to 20% on some projects. Most of it is found at inspection or snagging, when fixing it costs the most.

Construction Industry Institute via ASCE, 2026
09Delays and claims GCC
+83%

"When it goes to a claim, we can't prove what happened."

Middle East projects run 83% over their planned duration, the worst of any region. The number one cause of construction disputes in the region is claims that can't be backed up with evidence.

HKA CRUX via AGBI, 2022 · Arcadis Disputes Report
The root cause

The skill is already on your site. There is just no system to capture and share it.

So every new site depends on finding another great foreman, quality changes from crew to crew, and growth stalls. With Dubai construction costs up 5.2% in a year and fewer contracts being awarded, every lost hour counts. (AGBI, 2026 · Kamco, 2026)

3The what

Every problem, answered one by one.

The same nine problems, and what your company gets instead. Each outcome has the same number as the problem it solves.

01Hiring

Grow skilled tradesmen from your own crew

Helpers and juniors learn your best usta's technique step by step, so you depend less on the scarce, expensive specialists everyone is fighting over.

Answers 01: "I can't find enough skilled workers"
02New hires

New hires up to speed, safely, from day one

60-second lessons from your own best worker, in their language, from the first shift. Risky habits are flagged before they turn into injuries.

Answers 02: the riskiest first year
03Training and know-how

One standard method that stays with you

Your best usta's technique is recorded and taught to every worker in Hindi, Urdu, Bengali, Arabic, Tagalog and more. When he moves on, his know-how stays.

Answers 03: "Every foreman teaches his own way"
04Heat

Heat alerts before anyone collapses

The arm band warns the foreman early and prompts rest and water. Your midday break log is ready for MOHRE inspectors at any time.

Answers 04: summer heat, the midday break, inspections
05Accidents

Falls flagged in seconds, risks fixed before

Fall and impact alerts with the site zone and an SOS button, plus a map of slip and trip hotspots to fix before someone gets hurt.

Answers 05: "One serious accident and the site stops"
06Insurance

A safety record you can prove

Data on alerts, near misses and compliance gives you something real to show your insurer when you negotiate terms and handle claims.

Answers 06: "No data to argue back"
07Visibility

A full summary of every site, every evening

What got done, what slowed the crews down, quality, safety, and what to talk to each worker about tomorrow. Plus a live dashboard for every site you run.

Answers 07: "I can't be on every site"
08Rework

Rework stopped at the habit

The small habits that cause rework show up in the data and get fixed in the next lesson, long before snagging.

Answers 08: "We pay to build it twice"
09Delays and claims

Time-stamped records for every claim

A record of what was done, where and when, built automatically every day and ready when a delay or variation claim comes.

Answers 09: "We can't prove what happened"
4The how

Four clip-on add-ons. Tap one to see what it does.

Small add-ons go on top of the gear your crew already wears. Nothing to replace. Tap a dot on the worker to see the data each one collects, and what we do with it for you.

Tile worker wearing the USTA hat clip, arm band, wrist pod and boot clip
Concept mockup of the full USTA kit on a tile worker. Tap a dot.
USTA hat clip on the front brim of a hard hat

Hat clip

Clamps onto the front brim. No drilling, no glue.
Data it collects
  • Video of the hands at work, from the worker's own view
  • Head movement and where the worker is looking
  • Impacts and falls
  • Site zone, from beacons on each floor
  • SOS button press
What we do with it
What you get
  • Output counted from the video: tiles laid, bars tied, per hour and per worker
  • Lost time found: waiting for material, walking, redoing work
  • Rework habits spotted before the inspector sees them
  • Fall alerts with the zone, sent live to the foreman over 4G
  • Time-stamped daily records for progress reports and claims
Try the demo

Your site, in one dashboard.

See where every worker is in the tower right now, what each one got done today, the usta's footage cut into skills for new hires, safety per worker, and one full summary every evening. Click around.

app.ustarobotics.com · Tower C, Dubai MarinaDEMO · EXAMPLE DATA
5All the benefits

Everything you get, in one place.

One system, a benefit for everyone from the owner to the newest worker on site.

For the owner

Control without being on site

  • See every site from your phone
  • Less money lost to rework and idle hours
  • Scale to more projects without hunting for more star foremen
  • Stronger position with clients, insurers and in claims
  • First in line for Usta AI and construction robotics
For project and site managers

Run crews on real numbers

  • Full evening summary for every crew
  • Output per crew and worker, every day
  • Lost time found: waiting, walking, material bottlenecks
  • Rework caught early, before snagging
  • Daily records built automatically for progress reports and claims
For HSE

Safety you can prove

  • Live alerts for heat stress, falls and SOS
  • Midday break and hydration log for inspectors
  • Slip and trip hotspots on the site map
  • Strain and kneeling warnings before injuries
  • Safety data ready for clients and authority reporting
For your workers

Better, safer, rewarded

  • Learn from the best usta in their own language
  • Rest and water prompts in the heat
  • See their own progress and earn points
  • A monthly data bonus for wearing the kit
  • A path up to skilled and supervisor roles
6Pricing

One simple price. Per worker.

Move the slider to your crew size. See what you pay, and what your sites get back in performance, safety and outcomes.

50 workers
Per workerAED 1,000per month
That is aboutAED 38per worker, per shift
One-time setupKit fitting, site gateways, dashboard and crew trainingAED 40,000
MonthlyAED 50,000
  • Every worker: wrist pod, arm band, boot clip and the worker app
  • Hat cam for your best usta and new hires: 10 cams (about 1 in 5)
  • Dashboard, full evening summary and Usta lessons
  • Hardware included, no kit to buy · minimum 10 workers

What 50 workers get you

Performance
3,640hours of lost time a month made visible, so your managers can win them back
50workers learning from your best usta, in their own language
5crews with output, quality and a full evening summary every day
Safety
50workers under live heat, fall and SOS alerts on every shift
1,300shifts a month logged for the midday break and hydration, ready for inspectors
AED 200kthe statutory payout one fatal accident can cost, before uninsured costs of 8 to 36 times more
Money saved
20%
Our target is 20%. We measure it on your own site during the pilot.
More output from the same wagesAED 35,000
Jobs finished sooner, fewer months of site costsAED 20,800
Less reworkAED 17,300
Fewer injuries, faster training for new hiresAED 8,300
Saved per monthAED 81,400
USTA, per month AED 50k
Saved per month AED 81.4k

Example estimates, not guaranteed results. Savings assume a fully loaded cost of AED 3,500 a month per worker (wage, housing, visa, transport), about AED 250,000 of work built per worker per year, site running costs of 10% of the work, rework cut by a third and AED 2,000 per worker a year from fewer injuries and faster training. The 20% performance gain is our target, measured during your pilot. Lost time uses 8-hour shifts, 26 days a month, crews of about 10 and the 35% non-productive time found by FMI and PlanGrid (Autodesk). Rework uses the 5% average from the Construction Industry Institute. The accident figure is the UAE statutory maximum, with uninsured costs from HSE UK. The industry figures describe the industry, not USTA results. Prices exclude VAT.

7The big picture

From better crews today to robots on site tomorrow.

Three steps. Each one builds on the data from the one before, and your company is part of it from step one.

Hard hat with brim camera, wrist pod, arm band and boot heel clip
01Step 1
Now

Optimize current workflows and worker performance

  • Full transparency: output, quality and safety for every crew, every day
  • One standard: everyone trained to work like your best usta
  • Better management: decisions made on real numbers, not guesswork
  • Faster onboarding: new hires learn from the best worker on site
  • The result: faster building and less rework on site
Glass cube with a glowing hand model inside
02Step 2
Next

Contribute to the UAE's first construction-specialized AI

  • Usta AI: a specialized AI for construction performance, trained on real UAE sites
  • Every trade mapped: the best technique for each task, step by step
  • Smarter every project: each new site makes the model sharper
  • Extra cash flow: anonymized data licensed to AI companies like OpenAI
Robot arm laying a floor tile
03Step 3
Then

Use Usta AI to build robotics

  • Robotics partners: we team up with robotics labs to build specialized construction robots
  • Robots take the risk: the dangerous, heavy and repetitive tasks go to machines
  • Workers move up: skilled tradesmen manage the robots instead of doing the dangerous work
  • The result: safer sites and faster builds

Why this order? Robots can't learn a trade from YouTube. They need real hands doing real work, filmed from the worker's own view. Step 1 makes your sites better today, and it builds the data that steps 2 and 3 are made from. Companies on the waitlist are the first sites in.

8The waitlist

Be one of the first sites running on USTA.

We are opening USTA to a small group of construction companies first. Join the waitlist and we will reach out when your spot opens.

For construction companies, contractors and subcontractors
Waitlist companies get the first pilot spots
Free to join, no obligation
We reach out personally to plan your first trade and crew

Free · No obligation · We'll reach out personally

Early access for contractorsFree to join · No obligation
Join the waitlist